Netball Centre - Court Resurfacing

  • Project value$648,043.20
  • Contractor nameHardings Group
  • Completion Date31 March 2025
BCC Website tiles.png

With thanks to the Tasmanian government for providing $400,000 in grant funding for this project


The asphalt on courts 3-8 at the Netball Centre is being replaced due to large cracks in the playing surface and surrounding areas, which pose a safety risk for both players and spectators. Additionally, the courts do not meet Netball Australia's requirement for a consistent 1% cross-fall grade, which needs to be corrected.

The works will include:

  • Removal of the existing asphalt on courts 3 to 8.
  • Base regrading to remove high/low points and soft areas.
  • Drain replacement along the centre of the courts.
  • Replacement of grates on outer drains.
  • Installation of a new spoon drain.
  • New asphalt with acrylic seal.

Updates

April 2025

Hardings have completed all civil works for this project and have now demobilised from the site.Temporary line marking was carried out by Blacktac on 2 April 2025 in preparation for the Burnie Netball Association’s Wendy Berry Carnival. Court resurfacing commenced on 12 April 2025.

 

The first three courts have received all three coats of surfacing. Next steps include finishing the surrounds near the drainage grates and marking the court lines.The upgrade of the remaining three courts will follow, with timing subject to weather conditions.

IMG_0507.jpeg


January 2025

Hardings have commenced resurfacing works at the Netball Centre. The existing surface has been removed, and drainage improvements are underway, both within and around the courts. Excavation revealed substandard base material, which is being replaced prior to asphalt sealing.

 

reseal 1.png