Proposed works involve the removal of the existing headwall and installation of a new 450 mm diameter headwall, in conjunction with the construction of a 1050 mm diameter manhole to facilitate appropriate pipe grading.
The scope also includes re-stabilisation of the adjacent embankment along Shorewell Creek through the placement of suitable shrubs and native vegetation to enhance stability and environmental resilience.